EFC/SFC/PIB Memo- Generation

Printer-friendly version

Generation

Subject Date
Proposal for EFC Consideration for Revival of Hydro Power Sector / OM 31st Mar 2017
PIB Proposal in Respect of Naitwar mori HEP (60 MW) in Uttrakhand Implemented by SJVNL OM / PIB-Memo. 31st Mar 2017
PIB Proposal for RCE in Respect of Rampur HEP (412 MW) in Himachal Pradesh Implemented by SJVNL OM / PIB-Memo. 22nd Dec 2016
TEESTA LOW DAM, STAGE-III HE PROJECT WEST BENGAL 132MW(4X33 MW) Executed by NHPC Ltd. 7th Dec 2016
URI- II HYDRO ELECTRIC PROJECT 30th Sep 2016
SEWA II  PUBLIC INVESTMENT BOARD DOCUMENT 23rd Sep 2016
PIB Proposal in respect of Arun III HEP (4X225=900 MW) in Nepal implemented by SJVNL at an estimated cost of Rs. 5723.72 crore- OM / PIB-Memo 4th Apr 2016
PIB Memo for Tawang HEP Stage-II in Arunachal Pradesh- OM / PIB-Memo. 5th Jan 2016
Public Investment Board Memorandum for approval for formation and incorporation of a Joint  Venture Company between National Hydroelectric Power Corporation(NHPC) and Bihar State Power Generation Company Private Limited (BSPGCL) i.e Pirpainiti Bijlee Company Private Limited(M/s PBCL), infusion of equity beyond Rs. 500 crore by NHPC in M/s PBCPL and Investment approval for Construction of Pirpainiti Thermal Power Project:- O.M PIB - Memo 7th Dec 2015
PIB Proposal for appraisal of Pre investment activies in respect of Teesta-IV HEP 520 MW(4X130) in Sikkim by NHPC:- OM / PIB-Memo. 13th Aug 2015

PIB memo  for Pre investmentActivities Khurja STPP May 2015- OM/PIB

  1. Annexure I Load Generation Balance Report for Year 2014-15  
  2. Annexure II NHAI Letter dated 29.10.2013  
  3. Annexure III GENERAL LAYOUT PLAN-23.06.2014
  4. Annexure IV Sailent Features
  5. Annexure IX TOR issued by MoEF 27.10.2011
  6. Annexure V MOU with GoUP dated 31.12.2010
  7. Annexure VI MOU with UPSIDC dated 14.12.2013
  8. Annexure VII Water Commitment Letter
  9. Annexure VIII NOC from AAI
  10. Annexure X Coal Linkage Application
  11. Annexure XII CEA letter dated 28.12.2012 regd land requirement
  12. Annexure XIII MOM with Addl. Secy, MoP
  13. Annexure XIV UPSIDC letter dated 19.09.2014
  14. Annexure XV NHAI Letter dtd 27.11.2013 Reg Cost Estimate
  15. Annexure XVI Tariff, Cost per MW Comparison
  16. Annexure XVII Bar Chart of Activities
  17. ANNEXURE_XI Letter to CE, CEA regarding coal linkage
  18. ANNEXURE-XIa Letter from MoP to Addl. Secy., MoC
  19. Annexure-XVIII Compliance of Ministry

 

9th May 2015
PIB proposal for "Revised cost (at completion cost) of Nimmo Bazgo Hydro-Electric Project (45 MW)) Jammu & Kashmir" O.M /Index/PIB - NIMOO BAZGO/PIB - COVER PAGE/Annex PIB Nimmo Except Annex E/Executive Summary 6-2 2015/Annex-E-IFD_COMNTS 17th Mar 2015
PIB Memo for pre-construction activities of 1320 MW Buxar Thermal Power Project at an estimated cost of Rs. 436.68 crore in State of Bihar: - Part-1/ Part-2/ Part-3  11th Aug 2014
PIB Memo on Revised Cost Estimate(RCE) of Chutak Hydro-electric Project(44 MW) Jammu & Kashmir by NHPC Ltd.: - O.M./ PIB.   12th Aug  2014